1. | PT. Sanggar Sarana Baja for Conoco Phillips project | : PMI (Positive Material Identification), Hardnes Test |
2. | PT. Maxima Energi Indokemika –Power Plant | : PMI (Positive Material Identification) |
3. | PT. Sulzer Indonesia Turbo Services | : PMI, Phased Array for Turbine Wheel |
4. | PT Kaltim Pasific Amoniak, Bontang | : Eddy Current & Phased Array |
5. | PT. Surveyor Indonesia, Balikpapan | : Eddy Current, PMI |
6. | PT. Truba Engineering –Pelabuhan Ratu Power Plant | : Positive Material Identification (PMI) |
7. | Mitsubishi Chemical Indonesia-Merak | : Phased Array Inspection at Vessel |
8. | Pembangkit Jawa Bali (PJB) Muara Karang | : Phased Array Training, UT Flaw |
9. | PT Regrahta for Pertamina RU-VI Balongan | : Phased Array |
10. | Matcor- Singapore for PT. IPMOMI-Paiton | : UT, MT, PT |
11. | PT. Spektra Megah Semesta for Pertamina Hulu Energi | : Positive Material Identification (PMI) |
12. | PT Taji Mulia for for Power Plant Assessment-Kamojang | : Phased Array, Eddy Current, PMI |
13. | CV. Cipta Solusi Pratama (CSP) for PT. Sarihusada –Yogyakarta | : Eddy Current for Crack test project |
14. | PT. Spektra Megah Semesta for Pertamina PHE ONWJ, | : Phased Array Inspection |
15. | PT. PJB Pembangkitan Cirata | : Mapping Korosi |
16. | PT. Sucofindo, Palembang for TGI Gas, Sakernan Field | : Phased Array |
17. | PT. Panasindo for Pertamina UP III, Plaju | : Phased Array |
18. | PT. Spektra Megah Semesta for Hess Ujung Pangkah | : Phased Array |
19. | PT. Krakatau Engineering for Pertamina RU VI | : Phased Array |
20. | PT. Surveyor Indonesia for Cevron-Duri Riau | : Phased Array |
21. | PT. Petronesia Benimel for PGN Gas Pipeline | : Phased Array |
22. | PT. Daekyung Indah Heavy Industry | : Positive Material Identification (PMI) Phased Array |
23. | PT. LAPI ITB /PT Taji Mulia, IP-Gunung Salak | : MT/PT |
24. | PT. Taji Mulia, IP Tanjung Priok | : UT, PT, Hardness Test |
25. | PT. Taji Mulia-LAPI ITB-IP Kamojang | : NDT( UT, Hardness Test, Phased Array) |
26. | PT. Timas (Conoco Phillips Project)-Nort Belut | : Positive Material Identification (PMI) |
27. | PT. Pacific Viscouse Indonesia-Purwakarta | : Positive Material Identification (PMI) |
28. | PT Binder Indonesia | : Positive Material Identification (PMI) |
29. | PT. Sarku (Conoco Phillips Project-Nort Belut) | : Positive Material Identification (PMI) |
30. | PT. Kelsri | : Positive Material Identification (PMI) |
31. | PT. Supreme Energy | : MT/PT, UT |
32. | PT. GMF Aero Asia | : UT Phased Array, Eddy Current Array |
33. | PT. PJB Muara Karang | : UT Phased Array, PT |